![]() Every unit has a main panel with main breaker outside, then you need a panel with the main breaker included, and it would have to be 200A.If, however, you are actually indicating: Upgrading electrical service involves installing a new 200 amp distribution panel, meter socket, and electrical wiring. Then you should be fine as you don't actually need a main breaker in this panel. Hubert Miles Updated on Ap200 amp service upgrade is a process of increasing the capacity of your home’s electrical distribution system. Every unit has a main breaker outside between the meter and the feed to my panel inside (the panel I am replacing).However, it is convertible, so if you do need a main breaker, of any size up to 225A, that can be added later.Īssuming that main breakers are all together outside with unit # labels means: Amperage typically ranges from 60-amps in older homes to as much as 200-amps in new construction. If you have a home with this size service we recommend that it be upgraded to 100 amp service. It does not include a main breaker, so 225A tells you the maximum capacity but has nothing to do with protection of the incoming wire or preventing overload of the incoming service. This size service is inadequate for normal load use. The panel you linked is a main lug panel. With 200A service, that should, logically, be a 200A breaker. The only issue is the main breaker itself. You can always use a larger panel, and more spaces is also a good thing in case you ever need any additional circuits.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |